In the Node.js version before 20.0 a high severity vulnerability CVE-2023-30584 was detected. This vulnerability allows attackers to bypass file permission checks in Node.js by exploiting improper path traversal handling within the experimental permission model. To fix this problem users should upgrade Node.js to version 20.3.1. For more details, visit https://nvd.nist.gov/vuln/detail/CVE-2023-30584.
Node.js: Critical Path Traversal Vulnerability
by the Hossted team
12.09.2024